Annual Development Program (ADP) 2008-2009

Download progress report

Sl. No.

Name of the Project

ADP allocation (in Lac Taka)

1.

IDB Assisted Water supply facilities in the Coastal belt of Bangladesh (2nd Phase)

1012.00

2.

Bangladesh Water supply Program Project

4350.00

3.

Sanitation, Hygiene and Water Supply Project (GOB-UNICEF)

11000.00

4.

Water Supply and Sanitation in Coastal Belt Project (GOB-DANIDA)

5000.00

5.

Secondary Towns Water Supply and Sanitation Sector Project (GOB-ADB)

3006.00

 6.

Rural Water Supply in South Western part of Bangladesh

152.00

 7.

Groundwater Management and TPP for Survey, Investigation and Feasibility study in Upazila and Growth Center Level Pourashava having no Piped Water Supply System

 1000.00

8

Bangladesh Environmental Technology Verification-Support to Arsenic Mitigation (BETV-SAM)

1721.00

9.

Establishment of Sector Dvelopment Programme Management Unit ( SDPMU) in DPHE

1.00

10.

Char Development and Settlement Project-III (CDSP-III) DPHE Part

209.00

11.

Repair, Rehabilitation and Development of Water Supply System in Pourashavas including regeneration of Production Tube Wells

648.00

12.

Rajshahi City Water Supply (2nd phase)

1000.00

13.

Rural water supply project through out the country (5th phase)

3000.00

14.

Water Supply and Environmental Sanitation Project in Mongla Pourashava

338.00

15.

Water Supply, Sanitation and Drainage Project in Sylhet and Barisal City

100.00

 16.

 Establishment of National HRD Center of DPHE

 200.00

 
Developed By Systech Digital Ltd.