GoB Funded Projects

Sl. No. Name of the Project ADP allocation (in Lac Taka)
1. Repair, Rehabilitation and Development of Water Supply System in Pourashavas including regeneration of Production Tube Wells 1289.00
2. Accelerated Development Programme for Water Supply and Sanitation in CHT Districts 683.00
3. Environmental Sanitation and Water supply with piped network in Thana Sadar and Growth Center Pourashavas (1st Phase) 1800.00
4. 18 District Towns Water Supply , Sanitation and Drainage Project (Phase-II) 750.00
5. Rajshahi City Water Supply (2nd phase) 2055.00
6. Rural water supply project through out the country (5th phase) 6737.00
7. Water Supply and Environmental Sanitation Project in Mongla Pourashava 560.00
8. Water Supply, Sanitation and Drainage Project in Sylhet and Barisal City 100.00
9. Rural Water Supply in South Western part of Bangladesh 2997.00
10. Groundwater Management and TPP for Survey, Investigation and Feasibility study in Upazila and Growth Center Level Pourashava having no Piped Water Supply System 999.00
11 Establishment of National HRD Center of DPHE 0.00
12 National Sanitation Project (2nd Phase) 0.00

 

 
Developed By Systech Digital Ltd.